New Camera Installs -
1: Port number of edge and NVR in the CRM notes
Cables labeled with a sharpie (NVR, Edge, Cameras)
2: Photos of NVR and Edge in network rack - Close and Far (photo of switch if cams aren't in NVR)
Photo of the switch where NVR and Edge plug into
3: VMS / Local monitor screenshot
4: Notes if anything special / specific needed to be done
5: Password for Cameras
Install notes for Take over systems
1: Port number of edge and NVR in the CRM notes
Cables labeled with a sharpie (NVR, Edge, Cameras)
2: Photos of NVR and Edge in network rack - Close and Far (photo of switch if cams aren't in NVR)
Photo of the switch where NVR and Edge plug into
Pictures of Back of the NVR, Back of the edge.
For Marcos: pictures of what switch and port of where the cameras are plugged into.
3. VMS / Local monitor screenshot
4: Notes if anything special / specific needed to be done
5: Password for Cameras
6. Mac address of every device we are taking over
Partner Install Sheet
-Pictures of network rack/network area
-Equipment information ie. MAC address, serial #, activation codes etc
-Information regarding network ie. managed or unmanaged, vendors, network topology, credentials for equipment, etc
-Brand of cameras
-NVR settings if takeover ie. port setup, network settings, camera settings
-Pictures of cameras, NVR and edge